The Docklands loft quarter has a clever and thought out design.
We offer several options of finished and furnished apartments that create a cozy atmosphere and a feeling of infinite space in each room. Our interior solutions focus on panoramic windows, as well as on simple and clean lines.
Design projects for finishing are exclusive: they were specially created for the Docklands loft quarter by Zukauskas Architects architectural bureau and Designic St. Petersburg design studio. Depending on the building, we offer several coloring schemes: English or Scandinavian loft.
Finishing elements
Furniture and kitchen with built-in appliances are purchased separately. The developer can replace materials, goods, fixtures and equipment with similar ones that do not deteriorate the declared quality.
Все апартаменты в этом корпусе сдаются с полной чистовой отделкой в стиле Скандинавский лофт.
1. Hallway:
1.1. Ceiling: suspended, painted. Built-in and / or pendant lamps; access hatches to engineering systems.
1.2. Walls: aligned, painted.
1.3. Floor: painted wooden floor, with painted skirting boards.
2. Bathroom:
2.1. Ceiling: suspended, painted. Built-in and / or pendant lamps; access hatches to engineering systems.
2.2. Walls: coated with ceramic tiles, grouted and painted, built-in access hatches to engineering systems.
2.3. Floor: covered with grouted ceramic tiles.
2.4. Door: interior door with door trims and fittings.
2.5. Equipment connected and installed in the bathroom:
3. Room:
3.1. Ceiling: dust-free reinforced concrete surface / painted reinforced concrete surface, no surface preparation for painting. Overhead and / or suspended ceiling lamps.
3.2. Walls: aligned, painted. There are grilles of a mechanical supply and exhaust ventilation system. Terminal control devices for air conditioning systems, electrical plugs on the walls.
3.3.Floor: painted wooden floor, with painted skirting boards.
3.4.Complete electrical wiring for household appliances, in accordance with the electric engineering specifications.
All apartments located in DOCKLANDS FAMILY are given with a final finishing being highly prepared for cosmetic repairs. If you purchase apartments in the said blocks, you may additionally choose one of the "turnkey" finishing packages:
1. Entrance hall
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: parquet board, skirting boards* are installed.
2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. Heat-insulated floor is installed.
2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:
3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored, window casing and one of the walls are faced with a brick*. Wall-mounted lights are installed. There are grids of a mechanical supply and exhaust ventilation system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: parquet board, skirting boards* are installed.
3.4. Impuls kitchen furniture consisting of 4 sections* is installed, upper and lower modules are in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Bosch household appliances* are installed: a cooking unit with 2 cooktops, a cooker hood, a refrigerator.
1. Entrance hall
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: parquet board, skirting boards* are installed.
2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. Heat-insulated floor is installed.
2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:
3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored, window casing and one of the walls are faced with a brick*. Wall-mounted lights are installed. There are grids of a mechanical supply and exhaust ventilation system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: parquet board, skirting boards* are installed.
3.4. Impuls kitchen furniture consisting of 4 sections* is installed, upper and lower modules are in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Bosch household appliances* are installed: a cooking unit with 2 cooktops, a cooker hood, a refrigerator.
All apartments located in DOCKLANDS CLUB are given with a final finishing being highly prepared for cosmetic repairs. If you purchase apartments in the said blocks, you may additionally choose one of the "turnkey" finishing packages:
1. Entrance hall
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: parquet board, skirting boards* are installed.
2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. Heat-insulated floor is installed.
2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:
3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored, window casing and one of the walls are faced with a brick*. Wall-mounted lights are installed. There are grids of a mechanical supply and exhaust ventilation system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: parquet board, skirting boards* are installed.
3.4. Impuls kitchen furniture consisting of 4 sections* is installed, upper and lower modules are in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Bosch household appliances* are installed: a cooking unit with 2 cooktops, a cooker hood, a refrigerator.
1. Entrance hall
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: parquet board, skirting boards* are installed.
2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. Heat-insulated floor is installed.
2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:
3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored, window casing and one of the walls are faced with a brick*. Wall-mounted lights are installed. There are grids of a mechanical supply and exhaust ventilation system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: parquet board, skirting boards* are installed.
3.4. Impuls kitchen furniture consisting of 4 sections* is installed, upper and lower modules are in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Bosch household appliances* are installed: a cooking unit with 2 cooktops, a cooker hood, a refrigerator.
All apartments located in DOCKLANDS.SMART hotel are given with a full final finishing of Basic category.
1. Entrance hall:
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: porcelain gres, skirting boards* are installed.
2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. There is a floor gradient to the drain (the drain grid is installed) in the shower area, or a shower tray is installed.
2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:
3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored*. There are grids of a mechanical supply and exhaust ventilation system and air conditioning system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: porcelain gres, skirting boards* are installed.
3.4. Kitchen furniture consisting of 3 sections* is installed in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Household appliances are installed: a cooking unit with 2 cooktops, a cooker hood, a compact refrigerator.