Яндекс.Метрика Яндекс.Метрика

FINISHING

The Docklands loft quarter has a clever and thought out design.

We offer several options of finished and furnished apartments that create a cozy atmosphere and a feeling of infinite space in each room. Our interior solutions focus on panoramic windows, as well as on simple and clean lines.
Design projects for finishing are exclusive: they were specially created for the Docklands loft quarter by Zukauskas Architects architectural bureau and Designic St. Petersburg design studio. Depending on the building, we offer several coloring schemes: English or Scandinavian loft.

Finishing elements

  • Walls decorated with Danish clinker bricks Petersen Tegl
  • Walls painted with environmentally friendly paint
  • Floor covered with high quality materials: parquet boards, ceramic tiles
  • Reliable plumbing equipment

Furniture and kitchen with built-in appliances are purchased separately. The developer can replace materials, goods, fixtures and equipment with similar ones that do not deteriorate the declared quality.

docklands.vasilievsky

Все апартаменты в этом корпусе сдаются с полной чистовой отделкой в стиле Скандинавский лофт.

Finishing package: Scandinavian Loft from 850 000 RUB
Full finishing of premises with installation of necessary sanitaryware, equipped bathrooms, kitchen furniture with built-in appliances.

1. Hallway:
1.1. Ceiling: suspended, painted. Built-in and / or pendant lamps; access hatches to engineering systems.
1.2. Walls: aligned, painted.
1.3. Floor: painted wooden floor, with painted skirting boards.

2. Bathroom:
2.1. Ceiling: suspended, painted. Built-in and / or pendant lamps; access hatches to engineering systems.
2.2. Walls: coated with ceramic tiles, grouted and painted, built-in access hatches to engineering systems.
2.3. Floor: covered with grouted ceramic tiles.

  • If design includes a shower, the floor in the shower area either is sloped towards the drain (the drain grate is pre-installed), or there is a shower tray.
  • If design includes a bathtub, there is no floor slope or drain, the bathtub is connected to the water supply and drainage system.

2.4. Door: interior door with door trims and fittings.
2.5. Equipment connected and installed in the bathroom:

  • bath or shower
  • mixer for shower / bath, with a shower rack and a hand shower
  • shower partition (if design includes a shower)
  • floor-standing toilet
  • basin
  • basin mixer
  • mirror
  • electric heated towel rail
  • washing machine

3. Room:
3.1. Ceiling: dust-free reinforced concrete surface / painted reinforced concrete surface, no surface preparation for painting. Overhead and / or suspended ceiling lamps.
3.2. Walls: aligned, painted. There are grilles of a mechanical supply and exhaust ventilation system. Terminal control devices for air conditioning systems, electrical plugs on the walls.
3.3.Floor: painted wooden floor, with painted skirting boards.
3.4.Complete electrical wiring for household appliances, in accordance with the electric engineering specifications.

VISUALIZATION OF STUDIO FINISHING

More info
DOCKLANDS FAMILY

All apartments located in DOCKLANDS FAMILY are given with a final finishing being highly prepared for cosmetic repairs. If you purchase apartments in the said blocks, you may additionally choose one of the "turnkey" finishing packages:

Finishing package: English Loft from 500 000 RUB
Full finishing of premises with installation of IMPULSE German kitchen and Bosch built-in appliances, and decoration of walls part with Petersen Tegl clinker brick.

1. Entrance hall
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: parquet board, skirting boards* are installed.

2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. Heat-insulated floor is installed.

  • If a shower installation is designed in the layout: there is a floor gradient to the drain (the drain grid is installed) in the shower area, or a shower tray is installed.
  • If a bath installation is designed in the layout: there are no floor gradient and drain, the bath is connected to the water supply and water disposal system.

2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:

  • the bath or the shower*;
  • bath/shower mixer tap including shower column with hand shower;
  • hygienic shower;
  • glass and metal shower partition is installed (if a shower installation is designed in the layout).
  • wall-hung pan*;
  • washbasin;
  • basin mixer;
  • mirror;
  • electric towel warmer;
  • washing machine.

3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored, window casing and one of the walls are faced with a brick*. Wall-mounted lights are installed. There are grids of a mechanical supply and exhaust ventilation system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: parquet board, skirting boards* are installed.
3.4. Impuls kitchen furniture consisting of 4 sections* is installed, upper and lower modules are in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Bosch household appliances* are installed: a cooking unit with 2 cooktops, a cooker hood, a refrigerator.

  • Color and design solutions of materials, products, structures and equipment used in the premises decoration, are consistent with design documentation. Contractor has the right to replace materials, products, structures and equipment with similar materials which do not deteriorate the quality.
More info
Premium
Full finishing of premises with installation of LEICHT German kitchen and MIELE built-in appliances, and decoration of walls part with Petersen Tegl clinker brick.

1. Entrance hall
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: parquet board, skirting boards* are installed.

2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. Heat-insulated floor is installed.

  • If a shower installation is designed in the layout: there is a floor gradient to the drain (the drain grid is installed) in the shower area, or a shower tray is installed.
  • If a bath installation is designed in the layout: there are no floor gradient and drain, the bath is connected to the water supply and water disposal system.

2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:

  • the bath or the shower*;
  • bath/shower mixer tap including shower column with hand shower;
  • hygienic shower;
  • glass and metal shower partition is installed (if a shower installation is designed in the layout).
  • wall-hung pan*;
  • washbasin;
  • basin mixer;
  • mirror;
  • electric towel warmer;
  • washing machine.

3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored, window casing and one of the walls are faced with a brick*. Wall-mounted lights are installed. There are grids of a mechanical supply and exhaust ventilation system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: parquet board, skirting boards* are installed.
3.4. Impuls kitchen furniture consisting of 4 sections* is installed, upper and lower modules are in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Bosch household appliances* are installed: a cooking unit with 2 cooktops, a cooker hood, a refrigerator.

  • Color and design solutions of materials, products, structures and equipment used in the premises decoration, are consistent with design documentation. Contractor has the right to replace materials, products, structures and equipment with similar materials which do not deteriorate the quality.
More info
DOCKLANDS CLUB

All apartments located in DOCKLANDS CLUB are given with a final finishing being highly prepared for cosmetic repairs. If you purchase apartments in the said blocks, you may additionally choose one of the "turnkey" finishing packages:

Business On demand
Full finishing of premises with installation of IMPULSE German kitchen and Bosch built-in appliances, and decoration of walls part with Petersen Tegl clinker brick.

1. Entrance hall
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: parquet board, skirting boards* are installed.

2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. Heat-insulated floor is installed.

  • If a shower installation is designed in the layout: there is a floor gradient to the drain (the drain grid is installed) in the shower area, or a shower tray is installed.
  • If a bath installation is designed in the layout: there are no floor gradient and drain, the bath is connected to the water supply and water disposal system.

2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:

  • the bath or the shower*;
  • bath/shower mixer tap including shower column with hand shower;
  • hygienic shower;
  • glass and metal shower partition is installed (if a shower installation is designed in the layout).
  • wall-hung pan*;
  • washbasin;
  • basin mixer;
  • mirror;
  • electric towel warmer;
  • washing machine.

3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored, window casing and one of the walls are faced with a brick*. Wall-mounted lights are installed. There are grids of a mechanical supply and exhaust ventilation system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: parquet board, skirting boards* are installed.
3.4. Impuls kitchen furniture consisting of 4 sections* is installed, upper and lower modules are in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Bosch household appliances* are installed: a cooking unit with 2 cooktops, a cooker hood, a refrigerator.

  • Color and design solutions of materials, products, structures and equipment used in the premises decoration, are consistent with design documentation. Contractor has the right to replace materials, products, structures and equipment with similar materials which do not deteriorate the quality.
More info
Finishing package: English Loft Premium On demand
Полная чистовая отделка помещений с установкой кухни, встроенной техникой и декорированием части стен помещения клинкерным кирпичом Petersen Tegl.

1. Entrance hall
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: parquet board, skirting boards* are installed.

2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. Heat-insulated floor is installed.

  • If a shower installation is designed in the layout: there is a floor gradient to the drain (the drain grid is installed) in the shower area, or a shower tray is installed.
  • If a bath installation is designed in the layout: there are no floor gradient and drain, the bath is connected to the water supply and water disposal system.

2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:

  • the bath or the shower*;
  • bath/shower mixer tap including shower column with hand shower;
  • hygienic shower;
  • glass and metal shower partition is installed (if a shower installation is designed in the layout).
  • wall-hung pan*;
  • washbasin;
  • basin mixer;
  • mirror;
  • electric towel warmer;
  • washing machine.

3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored, window casing and one of the walls are faced with a brick*. Wall-mounted lights are installed. There are grids of a mechanical supply and exhaust ventilation system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: parquet board, skirting boards* are installed.
3.4. Impuls kitchen furniture consisting of 4 sections* is installed, upper and lower modules are in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Bosch household appliances* are installed: a cooking unit with 2 cooktops, a cooker hood, a refrigerator.

  • Color and design solutions of materials, products, structures and equipment used in the premises decoration, are consistent with design documentation. Contractor has the right to replace materials, products, structures and equipment with similar materials which do not deteriorate the quality.
More info
docklands.smart hotel

All apartments located in DOCKLANDS.SMART hotel are given with a full final finishing of Basic category.

Basic from 400 000 RUB
Full finishing of premises with installation of necessary sanitaryware, equipped bathrooms, kitchen furniture with built-in appliances.

1. Entrance hall:
1.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
1.2. Walls: finished, colored*.
1.3. Floor: porcelain gres, skirting boards* are installed.

2. Bathroom:
2.1. Ceiling: painted hanging ceiling. Built-in lighting fixture and / or pendant lighting fixture are installed. Utilities access panels are installed.
2.2. Walls: are faced with ceramic tiles* with grouting joints and colored, utilities access panels are installed. Grid of a mechanical supply and exhaust ventilation system is installed.
2.3. Floor: ceramic tile floor* with grouting joints. There is a floor gradient to the drain (the drain grid is installed) in the shower area, or a shower tray is installed.
2.4. Door: an interior door with casing and accessories is installed*.
2.5. Equipment connected and installed in the bathroom:

  • shower unit*;
  • shower mixer tap including shower column with hand shower;
  • Shower partition is installed;
  • pedestal pan*;
  • washbasin;
  • basin mixer;
  • mirror;
  • electric towel warmer.

3. Room:
3.1. Ceiling: finished, colored*. Surface-mounted luminaire and / or pendant lighting fixture are installed.
3.2. Walls: finished, colored*. There are grids of a mechanical supply and exhaust ventilation system and air conditioning system at the entrance near the ceiling. Air conditioning and heating systems end-user control as well as wiring products are mounted on the walls in accordance with design documentation.
3.3. Floor: porcelain gres, skirting boards* are installed.
3.4. Kitchen furniture consisting of 3 sections* is installed in accordance with design documentation. Kitchen appliances are connected to the water supply and water disposal system, a sink and a mixer are installed. Electric wiring for installation of household appliances is carried out in accordance with design documentation. Household appliances are installed: a cooking unit with 2 cooktops, a cooker hood, a compact refrigerator.

  • Color and design solutions of materials, products, structures and equipment used in the premises decoration, are consistent with design documentation. Contractor has the right to replace materials, products, structures and equipment with similar materials which do not deteriorate the quality.
More info
design projects
docklands.smart